4-Bed Detached Home — Full Retrofit, Surrey — case study

Case study

4-Bed Detached Home — Full Retrofit, Surrey

Property
Detached, 1970s
Sector
Homeowner
Location
Surrey
Services
Air source heat pump · Solar PV (6kW) · Battery storage · Loft insulation · Cavity wall insulation

The challenge

High bills, uneven temperatures, and an ageing heating system that struggled in winter peaks. The homeowners wanted a single coordinated plan rather than piecemeal upgrades — they'd seen a neighbour end up with a heat pump that didn't work well because the insulation wasn't sorted first.

Our approach

We completed a full whole-house assessment aligned to PAS 2035. Cavity wall and loft insulation were sequenced first to reduce heat loss, then a correctly sized air source heat pump was specified. Solar PV with battery storage was added to optimise self-consumption during daytime hours.

The results

EPC improved from E (44) to B (89). Annual energy cost reduced by £1,240. The installation was completed in three days of on-site work, spread across two weeks to fit the family's schedule. All documentation lodged with TrustMark within 48 hours of completion.

  • Annual saving

    £1,240

  • EPC improvement

    E → B

  • CO₂ reduction

    4.2t / yr

We budgeted for disruption and got almost none. Three days of actual work, spread across two weeks to fit our schedule. The house is warmer than it's ever been and the energy bills for the first winter were genuinely shocking — in a good way.
Richard and Fiona S., Surrey