Heat pumps
Three conditions that can change price: BUS grant ineligibility finding, structural issues with outdoor unit siting, electrical supply incapacity. Full list in the heat pump quote.
Our pricing commitment
Most installers won't put this in writing. We will, because the commitment only holds if we've staked our reputation on it.
The promise
No “discovered issues” surcharges for things we could have foreseen in our own survey. No creative interpretations of the scope. The invoice matches the quote.
The list is below. Those conditions are listed in your quote plainly, not buried in ten-point terms.
No “we're already here, might as well do it” pressure conversations. You get a revised quote in writing, with the specific added cost, the specific cause, and your options. That includes walking away with no cost.
No administration fees. No booking fees. No credit-card processing fees. No documentation fees. No “out of hours” fees unless the install is genuinely booked out of standard working hours.
We don't inflate quotes with speculative “just-in-case” margins. If the work turns out to take less time than estimated, we don't cut the invoice. But we also don't pad it in the other direction. The price is what we actually expect the work to cost.
The fine print, in large type
You gave us a postcode at quote time. If the install address turns out to be different, we re-price based on the actual location.
Pre-1999 properties may have asbestos in or around flue routes, boiler enclosures, or existing pipework. If our survey finds it, removal is a specialist job: typical cost £350–£1,200, handled by a licensed asbestos contractor.
If the survey finds the flue route contravenes current regulations (distances from doors, windows, neighbouring structures), we may need to reroute the flue. Cost typically £200–£500 depending on extent.
A standard combi boiler runs fine on most UK gas supplies. If yours is too small or too far from the boiler, a supply upgrade is required: typical cost £400–£800, usually done by your gas network operator (we coordinate).
If lifting the floorboards reveals pipework in such bad condition that more than 2m needs replacing beyond our standard scope, we quote the extra pipework separately at £200–£600.
What the commitment rules out
The backstop
Escalation route: anthony@smartenergie.co.uk goes direct to the director, not a support queue.
Beyond boilers
Three conditions that can change price: BUS grant ineligibility finding, structural issues with outdoor unit siting, electrical supply incapacity. Full list in the heat pump quote.
Two conditions: roof structural concerns found during fixing, DNO application delays for G99-grid connection. Full list in the solar quote.
The survey's moisture assessment is itself the gate; if it fails, we don't proceed. No surprise costs.
One main condition: existing sub-floor or screed incompatibility requiring remedial work.